Our wonderful engineer, Mr Amin Tariq paid a visit to the site today to oversee the construction so far. Mr Tariq has given a lot of his time for the project on a charitable basis for which all of the team at the Midland Doctors Association UK are indebted. His comments are below ‘It was basically to have an overview about the progress and to see how the plumbing services are understood by Rizwan to implement.
We discussed that and told Rizwan all plumbing pipes should be kept in sleeves so that later these can be replaced anytime for choking or malfunctioning.
I also checked the quality and fixing of protective bituminous sand coated membrane.
I checked with Rizwan all his survey layout issues resolved and room sizes are coming out as expected to drawings, which he confirmed.
I also took Rizwan along to two other sites and so that he could understand the strictness required in the complicated work of the superstructure.
I plan to visit in a week or two once again’